Hake Rigging – Transformer Move

This large transformer was taken up I-95 corridor to Peach Bottom Power Plant. It only traveled a few miles per day because of the size, weight, terrain and traffic conditions. We worked with Hake Rigging to develop a specific traffic control plan (maintenance of traffic) that would move this equipment with the least impact to the traveling public.